En Suite Renovation in Exmouth: Soil Pipe Relocation, Wall Hung Toilet and a New Layout

Max has been working hard on this en suite renovation in Exmouth, and it’s now finished. Here’s how it went from a tight, awkward room to something much better.

Finished en suite with wall hung toilet, semi-recessed basin, mosaic floor tiles and a chrome towel radiator

What the job involved

  • Relocating the soil pipe
  • Boxing in the pipework
  • Wall and floor tiling
  • Wall hung toilet and semi-recessed basin
  • Blocking up a doorway to change the layout

Moving the soil pipe

Relocating a soil pipe is the part of an en suite renovation that decides what’s possible. Where the toilet can go depends on where the waste can run, with the right fall, so it needs planning before any tiles go on the wall. Once it’s moved, the pipework is boxed in neatly so you don’t see any of it in the finished room.

En suite wall with the relocated soil pipe boxed in, wall hung toilet frame and flush plate fitted below the window

Changing the layout

Blocking up the old doorway and moving the pipework meant we could change how the room works, rather than squeezing new fittings into the old layout.

Old en suite doorway in a bedroom wall boarded over with plasterboard, ready for plastering
En suite mid renovation with new boarding, half height wall tiles, shower enclosure and pipework ready for sanitaryware

Why wall hung sanitaryware?

A wall hung toilet and a semi-recessed basin keep the floor clear, which makes a small room feel bigger and makes the floor much easier to clean. The cistern and frame sit behind the boxing, with only the flush plate on show.

Wall hung toilet and basin on a mosaic tiled wall in a finished en suite in Exmouth

Planning an en suite or bathroom renovation?

SAFEXE carries out bathroom and en suite renovations, including plumbing alterations and soil pipe relocation, across Exmouth, Exeter, Sidmouth, Honiton and East Devon. Get in touch to talk through your project.