Pinhoe Renovation: Phase 1 Heat Pump and MVHR Preparation Nearly Complete
Phase 1 of the Pinhoe renovation nearly done: low-temperature aluminium radiators with flow-meter valves, and the MVHR unit mounted ready for ductwork. Read more
Phase 1 of the Pinhoe renovation nearly done: low-temperature aluminium radiators with flow-meter valves, and the MVHR unit mounted ready for ductwork. Read more
MVHR ducting going in during the Pinhoe, Exeter renovation, and why the duct layout makes or breaks how well the system works. Read more
A routine boiler service for a word-of-mouth customer in Pinhoe, Exeter led, years later, to the full heating, plumbing and ventilation install on their house renovation with Devon Built. Read more