Pinhoe Renovation: Phase 1 Heat Pump and MVHR Preparation Nearly Complete

Flow gauge on new copper pipework during the Pinhoe heat pump renovation in Exeter

Phase 1 of the Pinhoe renovation nearly done: low-temperature aluminium radiators with flow-meter valves, and the MVHR unit mounted ready for ductwork. Read more

Urgent Heating Fault on an Older Gravity System in Exmouth

Engineer giving a thumbs up after an urgent heating repair

An urgent heating fault on an older gravity-fed system for a vulnerable customer in Exmouth. Max diagnosed it methodically and got the heating back on. Read more

PIV Installation in Exmouth for Condensation and Poor Airflow

Positive input ventilation unit installed in a loft in Exmouth

A PIV (positive input ventilation) unit fitted in a loft in Exmouth to tackle condensation and stale air, and when PIV isn’t the answer. Read more